In short: Mobile home park submetering means a community that buys gas, electricity or water through a master meter puts a meter (a submeter) at each space and bills each resident for that home's own measured use. In California, each billing period's statement shows the charge with the meter's opening and closing readings, whether the community or a billing company prepares it.
What Submetering Is
In some manufactured housing communities (often called mobile home parks), the utility does not serve each home. It delivers gas, electricity or water to a master meter for the community, or for a group of its homes, and bills the community for the total. A submeter is a meter at each space (the lot a home sits on), past the master meter, that measures what that one home used. Submetering is billing each resident from that home's own submeter. Our master meter vs. submeter guide explains the two meters side by side.
California's rules, from state law and, at LADWP, the utility's own rule, are set out below, each with its source. Each state sets its own rules, and Sentinel publishes a state's answer only after researching it to its statutes. Below, an investor-owned utility means a privately owned gas or electric company regulated by the California Public Utilities Commission, and management means the people who run the community; our utility billing glossary explains the other terms.
The Three Kinds of Submeter
California's weights-and-measures regulation names the three kinds a community uses (Cal. Code Regs., tit. 4, § 4070, Table 1):
- Electric watt-hour submeter: measures the electricity a home used, in kilowatt-hours (the measure electricity is sold by).
- Hydrocarbon vapor submeter: the gas submeter.
- Water submeter (domestic service): measures the water a home used. The Civil Code defines it as a device that measures one space's water use and that management owns and operates (Cal. Civ. Code § 798.40(d)(2)).
Who Owns, Reads and Tests the Submeters
| Task | Who, in California | Source |
|---|---|---|
| Owns the water submeters | Management, under the Civil Code's definition of a water submeter as a device management owns and operates | Civ. Code § 798.40(d)(2) |
| Maintains and repairs gas and electric submeters | The community, as the master-meter customer; the utility is not required to | Pub. Util. Code § 739.5(d) |
| Reads them and bills from them | The community, or a billing agent: a company that contracts with it to provide submetering services, including billing | Civ. Code § 798.40(b), (d)(1) |
| Inspects and tests them | A sealer of weights and measures (the official who checks measuring devices), with no more than 10 years between inspections | Cal. Code Regs., tit. 4, § 4070 |
How Often Submeters Are Tested
The national reference for how accurate a commercial measuring device must be is Handbook 44, published by NIST (the National Institute of Standards and Technology, a federal agency). Its requirements are recommended by the National Council on Weights and Measures for the states to adopt and use (NIST Handbook 44 (2026), Introduction), so each state decides how they apply.
California requires commercial weighing and measuring devices to conform to the latest Handbook 44, except where its own regulation provides otherwise (Cal. Code Regs., tit. 4, § 4000). Its inspection regulation sets 10 years as the maximum time between inspections by a sealer, which include trying and testing the device, for electric watt-hour, hydrocarbon vapor and domestic-service water submeters (Cal. Code Regs., tit. 4, § 4070, Table 1). Inspections may come sooner if the device user asks, during a complaint investigation, or on the sealer's own initiative (same section).
The regulation sets a maximum interval between a sealer's inspections; it does not require any particular share of meters to be tested each year. Our master meter vs. submeter guide gives the accuracy limits Handbook 44 sets for water meters and gas submeters.
How Readings Become Statements
In California, a submetered bill comes together in four steps:
- Record the readings. For each billing period, record each submeter's opening and closing readings and the dates of those readings (Cal. Code Regs., tit. 4, § 4090; Cal. Civ. Code § 798.40(a)).
- Work out each home's use: the closing reading minus the opening reading. For submetered water, the usage charge may never include water used by anyone other than the resident billed (Cal. Civ. Code § 798.40(c)(1)(D)), so when a resident moves out, a reading that day separates the leaving resident's use from the next resident's.
- Price that use by the method the law sets for that utility. Gas and electricity from an investor-owned utility are charged at the rate the resident would pay as the utility's direct customer (Cal. Pub. Util. Code § 739.5(a)), with the rates and quantities for each block of that rate shown (§ 739.5(e)), not the community's average price on its master bill. Where the rate is tiered (priced in steps, or blocks), the first block is the baseline quantity at the baseline rate, the lowest-priced step (§ 739(d)(1)). Submetered water is billed only by the methods the Civil Code lists (Cal. Civ. Code § 798.40(c)).
- Issue the statement and keep the records, under the rules below.
- Each invoice shows, for each utility, the opening and closing readings and their dates, the rates and quantities for each price step (block) of the rate, and the total charge for the period (Cal. Code Regs., tit. 4, § 4090).
- The rate schedules and each resident's billings are kept for at least 12 months and made available for inspection and copying by the resident and the county sealer (same section).
- The period's charges are stated separately along with the opening and closing readings, and the community posts the current residential rate schedule, or its web address with a free copy on request (Cal. Civ. Code § 798.40(a)).
- When a billing company prepares the billing, each resident's bill shows its name, address and telephone number (§ 798.40(b)).
- A gas or electric bill is itemized generally in the form of the utility's own bill to its residential customers (Cal. Pub. Util. Code § 739.5(e)).
- Where the Los Angeles Department of Water and Power (LADWP) supplies the water or electricity, each submetered space gets a separate written bill for each submetered utility, showing the usage, the opening and closing readings and the amount (LADWP Rule 18.C.2.c).
Whether a community may add a fee for this work depends on the utility; our billing fee guide gives California's answer for each. Our guide to billing residents for utilities covers the other methods, for communities without submeters.
Frequently Asked Questions
What is mobile home park submetering?
It is billing each home for its own measured use when the utility serves the community through a master meter. A submeter at each space (the lot a home sits on) measures that home's use, and the resident is billed from its readings.
Who owns the submeters in a mobile home park?
For gas and electricity in California, the master-meter customer (the community) maintains and repairs its submeter facilities past the master meter (Cal. Pub. Util. Code § 739.5(d)). For water, the Civil Code defines a submeter as a device that management owns and operates (Cal. Civ. Code § 798.40(d)(2)).
How often do mobile home park water meters have to be tested in California?
California's regulation sets 10 years as the maximum time between inspections by a sealer of weights and measures (the official who checks measuring devices), which include trying and testing the device, for domestic-service water submeters, and the same 10 years for electric watt-hour and gas submeters (Cal. Code Regs., tit. 4, § 4070, Table 1). Inspections may come sooner if the device user asks, during a complaint investigation, or on the sealer's own initiative.
Do electric meters in a mobile home park need testing?
California's regulation lists the electric watt-hour submeter with 10 years as the maximum time between a sealer's inspections, which include trying and testing the device (Cal. Code Regs., tit. 4, § 4070, Table 1).
What must a submetered utility bill show in California?
The opening and closing meter readings and the dates of those readings, the rates and quantities for each price step (block) of the rate, and the total charge for the period (Cal. Code Regs., tit. 4, § 4090). The Civil Code also requires the period's charges to be stated separately with the readings (Cal. Civ. Code § 798.40(a)), and, when a billing company prepares the billing, its name, address and telephone number on each resident's bill (§ 798.40(b)).
Can a mobile home park charge for reading the submeters?
Not on submetered water or on gas or electricity from an investor-owned utility in California. On submetered water, reading is part of the costs that one capped billing fee covers (Cal. Civ. Code § 798.40(c)(3)); on gas and electricity from an investor-owned utility no fee is added (Cal. Pub. Util. Code § 739.5(a)). Our billing fee guide covers every utility.
Sources
Every statement of law above cites its section or rule. Sources read on November 15, 2026.
- Cal. Pub. Util. Code § 739 — baseline and Medical Baseline allowances
- Cal. Pub. Util. Code § 739.5 — master-metered gas and electric service
- Cal. Civ. Code § 798.40 — statements, rate posting and submetered water
- Cal. Code Regs., tit. 4, § 4000 — California adopts NIST Handbook 44
- Cal. Code Regs., tit. 4, § 4070 — inspection frequencies, including submeters (Table 1)
- Cal. Code Regs., tit. 4, § 4090 — submeter billing records and invoices
- NIST Handbook 44 (2026), Introduction
- Los Angeles Department of Water and Power, Rules Governing Water and Electric Service, Rule 18 — submetering and cost allocation